Design Executive Gurugram | NA Posted On: 03-12-24 You ll make an impact by:
Collaboration with site staff and Colleagues in India and Oversea. Designing of Gas Turbine Open loop schemes including Turbine protection logics, Gas Turbine startup/ shutdown sequences. Release and maintain reference documentation in related databases. Gas & Steam turbine instrumentation engineering. Control HW wiring diag. and Instrumentation design ( Application E-Plan/ COMOS). Knowledge of power plant auxiliaries, electrical and generator schemes, and their control concept. Knowledge of major components of power plant. Instrument/Electrical Consumer lists. Perform technical and commercial review of control system supplier s offer. Define customer interfaces requirements (Signal Exchange List, Customer Letters, Customer Meetings). Coordinate Siemens internal I&C requirements (Generator, electrical etc.). Create project specific I&C solutions. Create project specific control system testing procedures. Provide technical solutions for issues identified during testing. Define and coordinate electrical consumer requirements with designer of motor control center. Create and issue project specific design documents (wiring diagrams, electrical specification). Define and issue field instrumentation specifications. Ensure site support (for erection and commissioning) up to handover of the turbine generator to customer (PAC). Proficiency in Microsoft excel / Access (Visual Basic macros etc.). Solid experience with working in a global team. Flexibility to travel in India & abroad. Ability and willingness to learn new fields, committed to personal development and continuous improvement. High flexibility in taking new tasks/responsibilities. Excellent written and verbal communication skills.
You ll win us over by:
Bachelors degree in Controls/ Electronics/Instrumentation Engineering. 5 to 6 years of engineering work experience. 3+ years of relevant engineering experience. Open loop & Closed loop (Governor) software engineering for large Gas Turbine, on SPPA-T3000 Platform. COMOS - Project I&C parameters engineering. Solid understanding of Functional Safety requirements IEC61508/IEC6151. Expertise in SPPA T3000, PCS7 system, COMOS or equivalent database tools. Experience with Siemens Gas / Steam Turbines / combined cycle power plant operation. Expertise in Steam turbine and it ands auxiliary s process. Clarify project design requirements and create internal structures for project execution. Understanding of plant auxiliaries, electrical and generator schemes and their control concept. Turbine/plant startup scheme and protection concept. Turbine transient study and functional testing of project governor schemes post software implementation. Provide field/site support. Steam turbine instrumentation engineering including instruments selection, electrical specs.
Employment Type: Full Time, Permanent
Role Category: Engineering
Education
UG: Any Graduate
PG: Any Postgraduate
PHP Continuous Improvement